According to general plan of National Energy Administration' s Notice on National Wind Power Development and Construction Plan for 2016 (Guoneng Xinneng [2016] No. 84), in 2016, the total development and construction scale of national wind power was 30.83 million kW, and new increased installed capacity of wind power of Henan Province ranked the first in China, According to the estimates, in the past three years, the installed capacity of wind power will reach 1,178MW in Anyang and surrounding areas.
According to general plan of National Energy Administration' s Notice on National Wind Power Development and Construction Plan for 2016 (Guoneng Xinneng [2016] No. 84), in 2016, the total development and construction scale of national wind power was 30.83 million kW, and new increased installed capacity of wind power of Henan Province ranked the first in China, According to the estimates, in the past three years, the installed capacity of wind power will reach 1,178MW in Anyang and surrounding areas. And the project investment will be nearly 10billion Yuan, The output value of wind power equipment manufacture is about 1 billion Yuan. In April of 2016, CNBM(AM) successfully won the bid for the 100MW wind tower production project of wind power farm of Jinfeng Group (the installed capacity is the largest currently, single tower with the height of 100m and total weight of 240tons), filling the gap of wind power equipment manufacture of CNBM and Anyang.
AM will focus on the target of building “Anyang Wind Power Equipment Manufacture Base”exert the advantages of raw material and equipment manufacture of Anyang, integrate the industrial chain, form the community through close relation with the enterprises such as Anyang Iron & Steel Group Co., Ltd. Anyang Longteng Heat Treatment Material Co.. Ltd.. etc. and undertake wind power equipment manufacture business of Henan Province jointly, reaching effective cooperation and mutual benefits and striving to achieve " Henan Equipment, Equipment Henan".